Day 040/ Almost DoneThis particular page will have some items that seem to jump around a bit. The crew is very close to finishing up the build. So, they have many finish items that are happening all at the same time this week. Very busy times.
The most visible item that is being finished is the kitchen. Yesterday the countertops were installed, toiday the sink has been cut out, waiting to be installed. The railing around the basement stairs has been finished and put in place. Bathroom floors and carpeting have all been finished.
Some major work was also being finished up in the basement. The heating unit for the hot water circulating system was installed. When you stand back and look at the whole thing it looks like a solid wall fo circulating pumps. You truly do need a map to figure out what is going on there sometimes.
|