Day 017/ Windows and ConcreteOn most days you would think that these two items do not mix well. Today they did. Most of the windows were installed in the rough openings of the home. The garage floor was also poured today. When you look at the photos you will see that the concrete is still wet. Remember all those tubes from yesterdays pictures? They are buried under the concrete now and will supply the heat to the garage area when the system is completed.
The electrician was also on site some time in the last day or so, as you will notice we now have some boxes hanging in places.
|